09/23/2025
** The below road work dates, are all weather permitting. The City will keep everyone as updated as possible. If there is any changes, there will be a call out.
The County will be doing road work on 9/23/2025,9/24/2025, and 9/29/2025 on the 13300 block of Chimney Rock and the 13500 block of Thousand Oaks.
On 9/29/2025, they will priming those roads in preparation to lay rock. During the priming process, those roads will be impassable. The priming process shouldn't take more than an hour.